Overhaul
Scope:
– Overhaul 8x MaK 20C while ship in drydock @Netherlands.
– Overhaul cylinder heads, fuel pumps, injectors and Charge Air cooler.
– General check on pistons, bearing check of connecting rod
– Liner inspection
– Rockers inspection
– Camshaft inspection
The job was carried out by IMSE engineers in drydock within 6 working days and another day for sea trials.
- Location
- Antwerp
- Year
- 2020
- Technology
- Averhaul